中文字幕久久熟女蜜桃,国产成A人亚洲精V品无码,臭小子我是你岳...你不能视频,熟女乱中文字幕熟女熟妇

網(wǎng)站首頁(yè)技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時(shí)間:2013-07-29 點(diǎn)擊量:3611

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

国产极品粉嫩福利姬萌白酱| 久久精品国产亚洲av蜜臀色欲 | 国精品人妻无码一区二区三区性色| 人妻少妇久久中文字幕| 精品国产av 无码一区二区三区 | 久久精品这里热有精品| 乱人伦人妻中文字幕无码| 欧美日韩在线视频一区| 亚洲av无码精品国产成人| 性生交大片免费| 国产精品国产av片国产| 国产精品成熟老女人| 国产精品麻豆va在线播放| 国产精品成人免费一区二区 | 亚洲永久无码7777kkk| 色婷婷av一区二区三区麻豆| 亚洲欧美一区二区三区| 欧美大胆a级视频| 久久久久亚洲精品中文字幕| 国产又a又黄又潮娇喘视频| 国产亚洲精品久久久久久小舞 | 国产精品久久久久久亚洲 | 亚洲精品国产精品乱码不99| 国内精品一区二区三区亚洲熟女乱综合一区二区 | 成人年无码av片在线观看| 日本一本午夜在线播放| 精品人妻人人做人人爽夜夜爽| 亚洲精品TV久久久久久久久| 适合女士自慰时看的黄文| 久久精品国产99国产精品导航| 无码a∨高潮抽搐流白浆| 日韩欧美卡一卡二卡新区| 极品少妇被啪到呻吟喷水| 日产乱码一二三区别免费一| 国产精品 高清 尿 小便 嘘嘘| 激情爆乳一区二区三区| 久久亚洲精品AB无码播放| 无码人妻精品一区二区三区在线| 国产精品va在线观看无码| 中国猛少妇色xxxxx| 少妇特黄a一区二区三区|